|
- How this portion of the study should be used
- Assumptions that had to be made to create this model, along
with limitations to this analysis
- An analysis of the rate of protection of different resources
by comparing different scoring systems. This section includes
an analysis of the costs of openspace acquisition
- Different visions of Charlestown at buildout, depending
on the amount of openspace acquired
|